-1037x692.jpg&w=2048&q=80&dpl=dpl_5G3HPmBBKT3wSCGNNvEWGwx2hRyP)
Iceland's transmission system operator annually releases a System Plan, comprising transmission system studies, a project plan for upcoming years, and future system evolution scenarios.
The project's objective
Each year, Iceland's transmission system operator's Landsnet publishes Kerfisáætlun (System Plan). The plan includes studies of the transmission system, and a project plan for the next years, plus some future scenarios of the evolution of the transmission system.
EFLA has been a major consultant in this project each year, and has made many of the system studies that the System Plan is based on.
The System Plan presents both short and long term planned projects, and several system studies are made for different scenarios in the plan. EFLA is a major consultant, works closely with Landsnet, and has made many of the system analyses presented. Also, EFLA has done some macroeconimic analyses for the plan.
EFLA's role
- Consultancy
- System analyses and system studies
- Macroeconomic analyses
Related projects
All projects
Renewable energyEmergency Restoration Planning | Canada
Emergency Restoration Planning for an 1100 km HVDC line
IcelandUrban planningRenewable energyWindfarm - Preliminary design
EFLA completed preliminary design and feasibility studies for a wind farm on Hafið, a lava plain above Búrfell in South Iceland.