Transmission line, 150 kV, Brattmyrliden - Moliden
Vattenfall Eldistribution AB, is building a 43 km 150 kV OHTL from Brattmyrliden to Moliden. The line consist mainly of wood poles with few composite poles where poles are located in swamp/farmland. The line will be built parallel to an existing 400 kV line.
About this Project
Client
Vattenfall Eldistribution AB
Timespan
2016-2017
Location
Sweden, from Brattmyrliden to Moliden
Contact
Steinþór Gíslason Director | Energy Phone: +354 412 6200 / +354 665 6200 E-mail: steinthor.gislason@efla.is Reykjavík
The project's objective
EOn Vind is planning a 70MW wind farm in Brattmyrliden. The line will go from UT171 Moliden to EOn wind station in Brattmyrliden. In the 43 km 150 kV OHTL from Brattmyrliden to Moliden, Vattenfall decided to use wood poles with few composite poles where poles are located in swamp/farmland.
EFLA made finalization of the exact line route and tower spotting. EFLA made also geotechnical estimates for foundation design. EFLA designed all the wood poles. For the design of the towers and the foundations, EFLA used specialized Excel Macros along with ICEtow.
One of the challenges in the project was height restriction of wood poles during tower spotting. Tower spotting was also preferred as close as possible to the existing parallel 400 kV line. Tower spotting also includes other restrictions such as nature conservation areas.
Environmental issues
Vattenfall was responsible for the choice of the line route, environmental studies, building permits.
Service Components
EFLA's role
- Environmental and risk list (BAS-P)
- Time schedule
- Tower spotting
- Preparation of load tree
- Structural design of wood poles (approx. 90% of all towers)
- Preparation of assembly drawing for each tower type
- Preparation of Sope of Work and Bill of quantities of towers and all other line equipment