News

Transportation of 600 ton crane

16.1.2012

EFLA recently participated together with specialists from Swiss and Holland in transporting a 600 ton landing crane from Dubai Aluminium in Dubai to EMAL Aluminium Smelter in Abu Dhabi.

 


EFLA´s responsibility in the project was to make sure that the cranes Electrical Control system operated correctly. The target was to ensure that the centre of gravity could by moved during "lift" and "landing" to and from the vessel.

 

The project was executed without problems and the landing crane is now on rails in EMAL waiting to be commissioned.

 

image003image008krani